PropCheck™Construction Monitoring & EvaluationLahore · Rawalpindi · Islamabad

Your contractor says
“sab theek hai.”
Can you prove it?

You are spending crores on a building you cannot measure. A PropCheck engineer inspects your site, counts what arrives, measures what is built, and certifies every contractor bill before you release the money.

آپ کروڑوں روپے ایسی عمارت پر لگا رہے ہیں جسے آپ خود ناپ نہیں سکتے۔ پراپ چیک کا انجینئر آپ کی طرف سے ہر بل کی تصدیق کرتا ہے۔

Step 01 of 04 — 8 seconds

Start here: what are you building?

No form yet. Three taps and we show you what is currently going into your plot unverified.

Plot size
City
Where is the work today?

Nothing is submitted at this step.

CL 01 · Findings

Six places the money leaves, and none of them are visible from a WhatsApp photo

A house is the largest single purchase most families ever make. Most owners supervise it with a phone call and a picture sent by the same man they are paying. The gap between what was billed and what was installed is where the money goes — and it usually surfaces years later, as a crack, a leak, or a slab that has to come down.

LEAK 01

Material substitution

Lower-grade steel, cheaper cement, under-size brick delivered to site — billed at the premium rate you approved.

LEAK 02

Short quantity

Fewer cement bags in the mix, a thinner slab, less steel in the column than the structural drawing calls for.

LEAK 03

Inflated running bills

A bill raised for 70% completion when measurement against the BOQ would show 50%.

LEAK 04

Buried defects

Poor curing, thin waterproofing, wrong plumbing fall. Invisible the day it is done; expensive the year it fails.

LEAK 05

Schedule drift

No tracked programme, so a twelve-month house takes twenty — and every extra month costs you rent, rates and inflation.

LEAK 06

The absent owner

You are in Dubai, Manchester or a clinic in Johar Town. Your cousin visits on Sundays and cannot read a bar schedule.

Step 02 of 04 — your exposure
CL 02 · Calculation

How much of your budget is still unverified?

Change these to your own figures. The arithmetic below is yours, not ours — every assumption is on screen and adjustable.

Rs 4,50,00,000 — 4.50 crore

Used to price monitoring for the remaining build only.

Who checks the material when it arrives on site?

This is your assumption, not a measurement of your site and not a claim about your contractor. Drag it to whatever you believe is realistic — the figure below follows it.

Unverified spend from today onward

Rs2,47,50,000

2.48 crore still to be spent on this site

Rs 2.48 crore of your budget has not yet been spent on your plot. On your own figures, nobody in particular is measuring what it buys. At 8%, that exposure is worth Rs 16 lakh.

At your assumed loss rateRs 16 lakh
PropCheck Standard, 10 monthsRs 36 lakh
One-time audit insteadRs 55,000

On these numbers monthly monitoring is hard to justify for this project — start with the one-time audit at Rs 55,000 and decide from the report.

CL 03 · Method

Five things a PropCheck engineer does on your plot

We are not a builder. We take no construction contracts, supply no material and sell no plots. You pay us to check the work of the contractor you hired. That independence is the entire product — a report that could be bought would be worthless.

01

Scheduled site inspection

A qualified civil engineer attends on a fixed schedule — and on the day of a major pour. Every visit produces dated photographs and video, on your phone the same day.

مقررہ شیڈول پر کوالیفائیڈ سول انجینئر کا دورہ، اور ہر بڑی چھت کے دن موجودگی۔

02

Material verification at the gate

Steel grade and bar diameter checked with a gauge. Cement brand and bag count recorded against the delivery challan. Brick class, sand and crush quality, and the concrete mix ratio at the mixer.

سریے کا گریڈ اور سائز، سیمنٹ کی بوریوں کی گنتی، اینٹوں کی کوالٹی اور کنکریٹ کا تناسب۔

03

Quantity survey against your BOQ

Completed work is physically measured and set against the bill of quantities, so you pay for what exists rather than what is claimed. No BOQ? That is the first thing to fix, and we can prepare one.

مکمل شدہ کام کی عملی پیمائش اور بی او کیو سے موازنہ۔

04

Bill certification before release

Every running bill is verified and signed by our engineer before you transfer anything. We never hold your money — you do. We simply refuse to certify what the tape does not support.

ہر رننگ بل ادائیگی سے پہلے ہمارے انجینئر کی تصدیق اور دستخط کے بعد۔

05

Defect list with deadlines

Anything wrong is recorded in writing with photographs, a correction method and a date. The item stays open until it is re-inspected and cleared — caught while it can still be corrected, not after the plaster is on.

ہر نقص تصاویر، اصلاحی طریقے اور آخری تاریخ کے ساتھ تحریری طور پر ریکارڈ۔

CL 04 · Terms

What it costs, next to what it protects

Breaking out one weak slab

Rs 8–15 lakh

Demolition, re-shuttering, fresh steel and concrete, plus the weeks lost — on a 1 kanal house. Typical remediation range; your figure depends on span and access.

Grade swap across a full structure

Rs 4–9 lakh

What a quiet substitution from Grade 60 to Grade 40 steel can be worth over a whole house — money that leaves your account and never reaches your columns.

One PropCheck audit visit

from Rs 25,000

One engineer, one inspection, one written technical report with photographs. The cheapest version of finding out.

Included in every monitoring engagement
Scheduled engineer inspections2 to 8+ visits per month depending on package, plus attendance at major pours
Core
Dated photo and video recordOn WhatsApp the day of the visit — your own evidence file, kept whether you stay with us or not
Core
Written inspection reportWithin 24–48 hours of each visit, plus a consolidated monthly summary with percentage completion
Core
Bill certificationSigned verification on every contractor running bill before you release payment
Core
Defect register with deadlinesOpen until re-inspected and cleared, with the correction method specified
Core
Direct line to your engineerWhatsApp and phone access to the named engineer on your project — not a call centre
Included
Pre-pour attendance on requestTell us the date of a slab and we will put an engineer there for it
Included
Handover checklist at completionThe last chance to have defects corrected at the contractor's cost, not yours (Premium)
Included
Your decision
See rates below
Monthly monitoringSite visitsFeeBest for
Basic — Watch2 per monthRs 155,000 / moSlow builds, structure-only watch
Standard — Verify4 per monthRs 355,000 / mo1 kanal and above, overseas owners
Premium — Control8+ per monthRs 450,000 / moPlazas, resorts, multi-unit projects
One-time audit & written report5 marla10 marla1 kanal2 kanal
Single inspection visitRs 25,000Rs 45,000Rs 55,000Rs 85,000

Third-party laboratory testing, travel outside the listed cities and applicable taxes are quoted separately. Plots above 2 kanal and commercial projects are priced on scope.

Step 03 of 04 — the owner file
CL 05 · Intake

So the engineer walks in already knowing your site

This is not a mailing list. It is the file the assigned engineer reads before he calls you, so the first conversation is about your columns and not your contact details.

Where are you right now?
How is the contractor engaged?
Do you have a signed BOQ and approved drawings?

Still nothing sent. The send button is at Step 04, and you will see the exact message first.

CL 06 · Risk

We carry the risk of the first visit, not you

Proposed first-report guarantee

If our first inspection report does not identify a single correctable deviation on your site, the audit fee is returned in full.

You keep the report, the photographs and the measurements either way. We are asking you to risk one visit to find out what is actually in your building — and if we find nothing worth correcting, that is the best news you will buy this year, so you should not pay for it.

6

New monitoring projects taken per city, per month. Each engagement is a named engineer's calendar, not a subscription seat — when the month's inspection capacity in Lahore or Rawalpindi is committed, intake closes until the next cycle.

Step 04 of 04 — book the engineer
CL 08 · Instruction

Put an engineer on your plot

Choose what you want first. Most owners of 5 and 10 marla houses start with the one-time audit and decide about monitoring after they have read the report.

What do you want to start with?

You will see the exact message before anything is sent.

CL 09 · Queries

What owners ask before they book

My contractor is a relative. Isn't this insulting to him?
A good contractor welcomes an engineer, because our report is also his proof that the work was done correctly — it protects him from accusations later. The contractors who object to inspection are the ones who need it. And note what a refusal tells you, for free.

اچھا ٹھیکیدار انجینئر کی موجودگی کو پسند کرتا ہے، کیونکہ رپورٹ اُس کے لیے بھی ثبوت ہوتی ہے۔ جو ٹھیکیدار معائنے سے انکار کرے، نگرانی اصل میں اُسی پر ضروری ہے۔

Can you start when the house is already half-built?
Yes. We begin with an assessment of the completed work and record its condition in writing, then monitor everything from that point forward. We will not certify what we did not see, and the report says so plainly.

ہاں۔ ہم مکمل شدہ کام کا جائزہ لے کر اور اُس کی حالت تحریری طور پر ریکارڈ کر کے شروع کرتے ہیں، اور اسی نقطے سے آگے کی ہر چیز کی نگرانی کرتے ہیں۔ جو ہم نے خود نہیں دیکھا، اُس کی تصدیق نہیں کریں گے، اور رپورٹ میں یہ صاف لکھا جائے گا۔

What if your engineer and my contractor make a deal?
Three safeguards. Every report is photo and video backed with dates, so it can be re-checked independently. Engineers are rotated and their reports reviewed at head office. Our engagement prohibits staff from accepting anything from a contractor or supplier. Suspect it once and we change the engineer.

تین حفاظتی بندیشیں: ہر رپورٹ تصاویر اور ویڈیو سے تائید شدہ ہوتی ہے تاکہ آزادانہ دوبارہ جائزہ لیا جا سکے۔ انجینئرز تبدیل کیے جاتے ہیں اور اُن کی رپورٹس ہیڈ آفس میں نظرثانی کے لیے آتی ہیں۔ ہماری پالیسی کے مطابق عملہ کسی ٹھیکیدار یا سپلائر سے کچھ لینا قبول نہیں کر سکتا۔ ایک مرتبہ شک ہو تو انجینئر فوراً تبدیل کر دیا جائے گا۔

I live abroad. Can this run entirely remotely?
It was built for exactly that. The agreement is signed digitally, fees are paid by bank transfer, and you approve each contractor bill from your phone after seeing our certification. Video calls from the site are arranged on request.

معاہدہ ڈیجیٹل، ادائیگی بینک ٹرانسفر سے، اور ہر بل کی منظوری آپ کے موبائل سے۔

Can you actually stop a payment?
We never hold your money — you do. We refuse to certify a bill that does not match the measured work. Where your contract states that payment follows our certification, unverified work does not get paid.

ہم آپ کا پیسہ کبھی اپنے پاس نہیں رکھتے — وہ آپ کے پاس ہی ہوتا ہے۔ جو بل پیمائش شدہ کام سے میل نہیں کھاتا، اُس کی تصدیق سے ہم انکار کرتے ہیں۔ اگر آپ کے معاہدے میں شرط ہو کہ ادائیگی ہماری تصدیق کے بعد ہو گی، تو غیر تصدیق شدہ کام کی ادائیگی نہیں ہو سکے گی۔

I already have an architect. Isn't this the same?
No. An architect designs and visits for design compliance. We are there for execution — counting bags, gauging bar diameter, measuring work against the BOQ and certifying bills. Most architects welcome us, because it stops their drawing being compromised on site.

نہیں۔ معمار ڈیزائن بناتا ہے اور ڈیزائن کی پابندی کے لیے آتا ہے۔ ہم وہاں عمل کے لیے ہوتے ہیں — بوریاں گننا، سَریے کا قطر ناپنا، کام کو بی او کیو سے موازنہ کرنا اور بلوں کی تصدیق کرنا۔ اکثر معمار ہمیں خوش آمدید کہتے ہیں، کیونکہ یہ اُن کے ڈیزائن کی سائٹ پر خلاف ورزی کو روکتا ہے۔

Will you guarantee zero defects?
No, and be suspicious of anyone who does. We guarantee professional inspection, honest reporting and certification of what we observe. We cannot guarantee another man's workmanship — we make sure his mistakes are caught while correction is still cheap.

نہیں، اور جو کوئی ایسا وعدہ کرے اُس سے خبردار رہیں۔ ہم پیشہ ورانہ معائنے، ایماندارانہ رپورٹنگ اور مشاہدے کی تصدیق کی ضمانت دیتے ہیں۔ کسی دوسرے کے ہنر کی ہم ضمانت نہیں دے سکتے — ہم صرف یہ یقینی بناتے ہیں کہ اُس کی غلطیاں تب پکڑی جائیں جب اصلاح اب بھی سستی ہو۔

PropCheck™ · Construction Monitoring & Evaluation · propcheckonline.com

Lahore · Rawalpindi / Islamabad · Punjab, KPK and Gilgit-Baltistan on scope.
Figures on this page are illustrative and driven by inputs you control. They are not a measurement of any specific site and not an allegation about any contractor.

 01
PLOT
 02
FIGURES
 03
OWNER
 04
BOOKED
Step 01 — pick your plot size